but because of the tight schedule


Sports Network (AFP reporter Xu Mei Jun Tong Yang Jianguo) closed again after repair white sandbar Bridge opened to traffic more than two months, many people have found that many were crushed asphalt deck, multiple broken pavement.

Public Zhang Yulong, who lives Jiangxia Miaoshan Island Garden,http://dso.cc/home.php?mod=space&uid=11490, Hankou Evergreen Road in a company to work every day driving through the white sandbar Bridge. Last July,cheap jordan shoes, the white sandbar closed to repair construction, New Year's Day, white sandbar bridge finally opened to traffic. But he soon discovered that large trucks are very frequent in the past, in the middle of the bridge have been crushed asphalt trucks, deck appears damaged. He sad to say, when the bridge repair,air jordan pas cher,http://wenbinzndx.gotoip55.com/home.php?mod=space&uid=43129, bridge asphalt heard or imported from the United States, did not expect this issue soon reappeared.

At noon yesterday, the reporter from Wuchang drove on the bridge, seen in the cable segment, the bridge is about more than 10 blocks of asphalt was damaged, each area of nearly square, and some sections of the bridge group exposed seams there are large pit. In Dyke Road and River City Boulevard exit, there are many roads damaged. Big trucks coming and going on the bridge still gallop.

Wuhan City,http://www.gdeuhost.com/discuz/home.php?mod=space&uid=247272,louboutin outlet, the company responsible for the bridge Prudential white sandbar bridge repair and renovation projects,piumini woolrich, the company official said, both white sandbar bridge girder, but also ordinary reinforced concrete box girder,http://www.ciqin8.com/forum.php?mod=viewthread&tid=55134&fromuid=15778, the potholes appeared in an interview with reporters yesterday, all located ordinary reinforced concrete box girder,mulberry outlet store, mainly bridge.

He explained that the white sandbar bridge over asphalt pavement often "drift" in all parts of the steel box girder bridge closed last maintenance emphasis is also placed on a steel girder, all US epoxy asphalt,http://fan2.dakawu.com/forum.php?mod=viewthread&tid=34246, so far, steel box Liang did not appear epoxy asphalt pavement potholes.

While repairs last year, reinforced concrete box girder laying just plain asphalt pavement, just laying under the heavy rain, but because of the tight schedule, but to continue with the work after drying,http://www.aurosiksha.org/login/index.php?item/create_form/1, making the asphalt adhesive film quality discounted. Plus after the opening overloaded trucks rolling,http://www.aurosiksha.org/login/index.php?item/create_form/1, has been found in some of the potholes. The company apologize.

The official said, after the company had sent up over the potholes,http://www.wpapk.com/home.php?mod=space&uid=9871, but rain and snow, and soon reappeared potholes. After the weather cleared, the bridge will be completely repaired.